Tuesday, July 26, 2011

Objectives for August

Had a good meeting with my adviser on Friday and we developed a plan for August. The following are the objectives:

  • Re-run the model with the new flow conditions - there was a problem with the previous conditions - was off by 1/3 due to configuration of the flume.
  • Figure out how to display results using Matlab- Vector and contour plots.
  • Run model with many more vertical layers.
  • Display results for 2 dunes and calculate the bed shear stress
  • Being looking into sediment transport model - start with the continuity equation:
(1-p) dZ/dt = dq/dl


No comments:

Post a Comment